Duration of the production cycle of one batch
Fill in the blanks. Enter calculated answers in whole numbers. So, no decimal numbers!
Production time = Dosing and weighing + Grinding + Mixing
Capacity = Batch size ÷ Production time × 60
| Batch size | 1000 kg | 5000 kg | 10000 kg |
|---|---|---|---|
| Dosing and weighing | 10 min. | 6 min. | 8 min. |
| Grinding | 10 min. | 6 min. | 12 min. |
| Mixing | 5 min. | 3 min. | 2 min. |
| Production time of one batch | 25 min. | min. | min. |
| Capacity | 2.4 t/u | t/u | t/u |