1.3 Self Test

Water Availability Quiz Availability of Water Not all the water in the soil is available to the plant. Soil with a lot of organic matter can hold a lot of water. The more air left in the pores, [...]

Read More

1.2 Self Test

1.2 – Self-test Match each factor with the correct soil fertility type by dragging and dropping it into the correct column. Physical soil fertility Chemical soil fertility Biological soil ferti [...]

Read More

3.3 Self Test

Positive and Negative Aspects Quiz 3.3 – Self-test Below are some positive and negative aspects. Which of the following aspects are associated with a positive attitude? And which factors are a [...]

Read More

3.1 Self Test

Animal Handling Quiz 3.1 – Self-test Watch the video of an animal handler as they take cows out of their cubicles. 1. Don’t yell at cows –Select–PositiveNegative 2. Hitt [...]

Read More

2.3 Self Test

Animal Handling Self-Test 2.3 – Self-test: Match the Labels Assign each label (A–E) the correct concept: 1 – Flight Zone 2 – Initiate movement 3 – Dead angle 4 – B [...]

Read More

2.2 Self Test

DairyNex Quiz Image Matching Quiz Below are five images of different typical cow head positions.Which head position belongs to which expression? Neutral Submissive Tense Aggressive Confident Ch [...]

Read More

8.2 – Table quiz 4 part 2

Part 2 – Calculating Efficiency Calculating efficiency Fill in the blanks. Enter calculated answers in whole numbers. So, no decimal numbers! The gross capacity is 1000 kg/hour. Efficienc [...]

Read More

8.2 – Table quiz 4

Table Quiz 4 – Calculating Net Capacity Calculating net capacity Fill in the blanks. Enter calculated answers in whole numbers. So, without decimal numbers! The gross capacity is 1000 kg/ [...]

Read More

8.2 – Table quiz 3

Table Quiz 3 – Calculating Efficiency Calculating efficiency Fill in the blanks. Enter calculated answers in whole numbers. So, no decimal numbers! Efficiency (%) = (Net Capacity ÷ Gross [...]

Read More

8.2 – Table quiz 2

8.2 – Table Quiz 2 Gross and net capacity Fill in the blanks. Enter calculated answers in whole numbers. So, no decimal numbers! The production time is 10 minutes. The gross capacity is 6000 kg [...]

Read More